Current Economic Development and Housing Projects

Print
Press Enter to show all options, press Tab go to next option

The Culver City Community Development Department, Economic Development Division and Housing Division are partnering with prominent developers to bring a number of exciting projects to Culver City.  

 

IVY STATIONSlide 1c - Ivy Office

Lowe Enterprises Real Estate Group is developing a 5.52 acre Transit Oriented Development in the  Culver City Transit Oriented Development District. The $300 million project provides residential, office, retail, restaurant, and a boutique hotel with a large central open space. The project site is bounded by Washington Boulevard, National Boulevard, and Venice Boulevard and is adjacent to the Expo rail station. Cunningham Group is the project architect and Ehrlich Architects is designing the office component. Project set to begin construction in 2017.

Project Lead: Todd Tipton – email/310.253.5783

............................................................................................................................

WASHINGTON CENTINELA MARKET HALL PROJECT AND PUBLIC PARKING STRUCTURE

The Washington Centinela Market Hall Project is a 1.6 acre project located on the two northerly corners of Washington Boulevard at Centinela Avenue. The project is a public market featuring artisanal vendors under one roof to sell their products such specialty cheeses and charcuterie, a bakery, chocolatier and reWC 11.16-02lated confections, wine, locally grown produce, specialty coffee, flowers, organic meats, and other high-quality products. The City has selecte Regency Centers to develop the project. The Developer and Disposition Agreement and project plans are currently being finalized.

As part of the project, the City will be constructing an adjacent parking structure providing market hall parking as well as extra public parking for the Washington West Business District.

Project Lead Glenn Heald: email/310-253-5752

............................................................................................................................

DOWNTOWN PARCEL B AND TOWN PLAZA EXPANSION - THE CULVER STEPS

The City is collaborating with Hackman Capital Partners, LLC to bring a vibrant office and retail development to “Parcel B” in downtown Culver City near the historiParcel B new-01c Culver Studios.

The Culver Steps at 9300 Culver Boulevard is a 115,000 square food project that includes ground-level retail, a four-story office building, and a Grand Stair that leads pedestrians up to a restaurant pavilion and landscaped Elevated Plaza perched above the existing Town Plaza.

Retail shops will be strategically located to energize the existing sidewalks and streets and the Grand Stair serves the dual purpose of drawing people to the Elevated Plaza as well as providing amphitheater seating for concerts, performances and outdoor screenings.

Construction is slated to begin in Summer 2017. 

Project Lead: Todd Tipton – email/310-253-5768

 

 

 

............................................................................................................................

12803 WEST WASHINGTON APARTMENTS

The former Baldwin Motel property at 12803/12823 Washington Boulevard has been conveyed to the developer CCMU, LLC pursuant to the Disposition and Development Agreement (DDA) executed in 2008. The 24,000 squbaldwin webare foot property, bounded by Meier Street to the east and Moore Street to the west, will be used to develop a mixed-use project consisting of a ground floor retail component topped by approximately 37 residential apartments (with some affordable housing units)  and a full complement of subterranean and ground-level parking. The Project is in the West Washington Area Improvement Plan Phase I.

Project Lead: Glenn Heald – email/310-253-5752

 

 

 

 ..........................................................................................................................

REIMAGINE FOX HILLS reimagine web-01

 

Reimagine Fox Hills Master Plan will transform the existing suburban office park into a creative office district with a new “Main Street” of retail, shops, restaurants, open space, new shared parking opportunities, high speed fiber optic cable infrastructure, bike lanes and enhanced streetscape. Planning and visioning is currently underway.

Project Lead: Elaine Warner – email/310-253-5777

 

..........................................................................................................................

JAZZ BAKERY

jazz bakery-01

The City is partnering with the Jazz Bakery to develop a new 250-seat theatre on the west side of downtown Culver City adjacent to the Kirk Douglas Theatre. Plans are in the development phase.

Project Lead: Todd Tipton – email/310-253-5768

 

 

 

............................................................................................................................... 

GLOBE AVENUE HOUSING PROJECT (4044-4068 Globe Avenue)

The Culver City Housing Authority is working with Habitat for Humanity of Greater Los Angeles to develop 10 affordable,GloveAve for-sale housing units in the city. The Housing Authority is contributing the land for the project. The City has approved the Disposition and Development Agreement and the project is entitled. Construction is anticipated in 2017.

Project Lead: Tevis Barnes – email/310-253-5782

 

 

 

 ............................................................................................................................

WEST WASHINGTON AREA IMPROVEMENT PROGRAM

WestWashingtonThe West Washington Area Improvement Program (AIP), on West Washington Boulevard between Walnut Avenue and Atlantic Avenue incorporates two catalytic redevelopment sites – the Washington Centinela Market Hall and the Baldwin Project. The City has completed three phases of the AIPand will begin working with the businesses on Phase IV in early 2017 on the installation of landscape medians and other improvements to create a more pedestrian friendly environment.

Project Lead: Elaine Warner – email/310-253-5777

 

 ...........................................................................................................................

HAYDEN TRACT SPUR PARKING LOT

Work July 27 2016 018 (002)The City of Culver City and the Hayden Tract Owners Association (the, “Association”) have partnered to convert a former MTA railroad spur property between Hayden Avenue and Eastham Drive into a landscaped, linear parking lot. This project was recently completed. 

Project Lead: Glenn Heald – email/310-253-5752