Overland HFST Safety Improvements
|
Installation of High Friction Surface Treatment (HFST) on curved segment of Overland Ave from Maytime Ln to Northgate St (0.17 mile).
|
$677,000
|
CA Highway Safety Improvement Program (HSIP) Cycle 10
|
In design
|
Community Meeting |
Signalized Intersection Safety Improvements |
Traffic signal modifications at 10 locations. Improvements include new signal hardware, installation of protected left-turn phases, and implementation of leading pedestrian interval (LPI)
Locations are:
1. Washington Blvd at Beethoven St
2. Washington Blvd at Overland Ave
3. Washington Blvd at Inglewood Blvd
4. Culver Blvd at Sawtelle Blvd
5. Overland Ave at Braddock Dr
6. Overland Ave at Virginia Ave
7. Jefferson Blvd at Hetzler Rd
8. Centinela Ave at Green Valley Cir
9. Washington Blvd at Higuera St
|
$2,766,700 |
HSIP Cycle 10 |
In design |
Expect to complete design 7/2023
Construction to begin 11/23
|
Unsignalized Intersections Safety Improvements |
Safety improvements including addition of intersection lighting, installation/upgrade of stop signs and other warning and regulatory signs, and upgrade of intersection pavement markings at 12 unsignalized intersections on Washington Blvd, Sepulveda Blvd , Washington Pl, and Higuera St. |
$1,545,700 |
HSIP Cycle 10
|
In design |
Expect to complete design 7/2023
Construction to begin 11/23
|
Ince/Lucerne Intersection Redesign
|
Redesign of the intersection of Ince Blvd/Lucerne Ave using temporary devices and enhancements to pavement markings
|
$50,000 (estimated) |
City CIP (7/2022)
|
In design
|
Expect to complete design 7/2023
Construction to begin 11/23
|
Slow Streets Program |
Program established in 4 City neighborhoods using temporary COVID funds. Provides signage, barricades, and safety education for each location. Run by community volunteers
|
$10,000/location |
Unfunded |
Coordinate with community volunteers to maintain current locations
|
Accept new requests and place on waiting list
|
Expo-Downtown Bike and Ped Improvements
|
Bicycle and pedestrian improvements along Washington Blvd between Landmark Ave and Helms Ave, and along Robertson Blvd in the vicinity of the E-Line Station
|
$1,956,529 |
Metro Active Transportation (MAT) Grant
|
Washington Blvd improvements installed with Move CC project |
Begin design process for Robertson Blvd
|
La Ballona Creek Bike Path Improvements |
Design and construction of sustainability, safety, and accessibility improvements on the segment of the La Ballona Creek Bike Path from Duquesne Ave to National Blvd (1.1 miles) including re-surfacing with permeable pavement, installation of solar powered lighting, enhancements to signage and pavement markings, accessibility improvements, and landscaping.
|
$2,800,160 |
Baldwin Hills Conservancy Grant - $1,952,500
Local Match - 847,660
|
In design
Community Meeting 1/18/23
|
Complete design by August 2023
Begin Construction Octiber 2023
|
Traffic Safety Education |
Citywide multi-modal traffic safety education program for seniors, working adults, school age students, and unhoused community members.
|
$75,000 |
CA Office of Traffic Safety (OTS) 21/22
|
Contract awarded to Walk and Rollers |
Purchase safety equipment
Begin community training
|
Overland-Playa Pedestrian and Bicycle Improvements |
Design of pedestrian improvements, HAWK signal at the library, and Class II and Class IV bike lanes on Overland Ave between Venice Blvd and the Transit Center (2.8 miles) |
$6,367,700 |
Measure M Sub Regional Fund (WCCOG) - $842,496
Unfunded - $5,525,204
|
In design
|
Community Meeting
Pursue construction funding
|
Complete Streets Design Guidelines |
This project will prepare a comprehensive, community-driven Complete Streets Design Guidelines. The Guidelines will identify complete streets elements and multimodal design improvements to enhance safety especially for the most vulnerable roadway users, including pedestrians, bicyclists, and transit riders, while still serving motorists |
$564,780 |
Sustainable Trans Planning Grant (Caltrans) - $500,000
Local Match - $6,000
|
Secure consultant contract
|
Begin draft guidelines
Plan for community meeting/input
|
Fox Hills Master Plan |
Fox Hills Master Plan covering land use and transportation. The transportation system analysis includes parking supply and management to meet shortage for area residents.
|
$640,000 |
Unfunded |
Concept plan completed
|
Pursue future funding sources
|
Farragut Dr Bike Boulevard Project
|
Establishment of bike boulevard signage and pavement markings, traffic calming devices including speed cushions and traffic circle, ADA compliant curb ramps, and construction of missing sidewalk segments. Farragut Dr between Overland Ave and Duquesne Ave
|
$1,500,000 (estimated) |
Measure M - $250,000
Construction - Unfunded
|
Secure consultant contract
|
Begin design
Secure construction funding
|
Fox Hills NTMP and Bikeways project
|
Implement Class II and Class IV bike lanes on multiple area streets, enhancements to signage and pavement markings, and implementation of traffic calming devices including speed humps, bulb outs and traffic circles. |
$1,100,000 |
Metro Measure M - $600,000
Parking Fund - $162,000
Fox Hills NTMP - $150,000
City CIP - $150,000
|
In design
Community meeting held.
|
Present 100% plans to community
Pursue full construction funding
|
Safe Routes to School |
Upgrade curb ramps, enhance signs and markings at El Rincon Elementary, El Marino Elementary, Farragut Elementary and Middle Schools |
$200,000 |
City CIP |
In design |
Complete Final design by 6/203
Prepare for construction
|
I-405 SB Ramps at Sawtelle Blvd/Matteson Ave |
Traffic signal modification to allow for protected left turn movement at freeway off-ramp |
$146,947 |
Sony Mitigation Funds |
In design |
Obtain Caltrans permit.
Prepare for construction
|
Los Angeles World Airports (LAWA) – ITS Improvements
|
Install Intelligent Transportation System (ITS) improvements along Sepulveda Blvd between Jefferson Blvd and Centinela Ave. Improvements include one changeable message sign (at Slauson), battery backup systems and video detection units.
|
$2,710,000 |
LAWA |
In construction
|
Construction to be completed 7/2023 |
Arts District Parking Study |
Parking study along Washington Blvd within the Arts District |
$150,000 |
City CIP
|
|
Release consultant RFP |
Bicycle and Pedestrian Action Plan Implementation
|
Implementation of the bikeways network as recommended by the 2020 BPAP. Projects would be implement in segments and contingent on future funding.
Segments include:
1 - Overland Ave btw Venice Blvd and Sepulveda Blvd (Class IV)
2 - Sepulveda Blvd btw Ballona Creek Bridge and Jefferson Blvd (Class IV)
3 - Sepulveda Blvd btw Jefferson Blvd and Centinela Ave (Class IV)
4 - Jefferson Blvd btw Sepulveda Blvd and Higuera St (Class IV)
5 - Centinela Ave btw W City Limit and Sepulveda Blvd (Class II)
6 - Centinela Ave btw Sepulveda Blvd and E City Limit (Class IV)
7 - Culver Blvd btw Elenda St and Duquesne Ave (Class II)
8 - Green Valley Cir (Class II), Bristol Pkwy (Class II), Buckingham Pkwy (Class IV)
9 - Sawtelle Blvd btw Venice Blvd and Braddock Dr (Class II)
10 - Sepulveda Blvd btw Venice Blvd and Braddock Dr (Class II)
11 - Washington Blvd btw Harter Ave and Overland Ave (Class II)
12 - Washington Blvd btw Hargis St and Adams Blvd & Adams Blvd to LA City Limit (Class II)
|
$10,000,000 (estimated)
|
Segments 3, 4, 6, 7, 9, 10, 11 - Unfunded
Segment 1 - Included with Overland-Playa Project
Segment 2 - $250,000 (from 11111 Jefferson Project)
Segment 5 - Included with City paving project
Segment 8 - Included with Fox Hills NTMP
Segment 12 - $200,000 City CIP
|
Segment 12 - to be incorporated with Move CC
Segment 8 - Design progressing with Fox Hills NTMP
|
Pursue grants, local funding and development agreements to secure funding for all segments.
Segments 2, 3, 7 - begin design
Segment 5 - to be completed by Aug 2023. |
Rancho Higuera NTMP - Phase 1 |
Neighborhood traffic calming plan currently under construction following the planning, design and community consultation. |
$348,000 |
Culver Studios Mitigation |
Phase 1 improvements complete |
Secure funding for phase 2
|
La Ballona Elementary School Safe Routes to School |
Pedestrian improvements around La Ballona Elementary School, including: curb extensions, ADA ramps, high-visibility crosswalks, controlled intersections with median refuge islands on Washington Blvd, street trees and pedestrian-scale lighting, protected bike lane on Elenda Street between Culver Blvd and Washington Blvd
|
$2,720,000 |
CA ATP Grant - Cycle 2
|
Project complete |
Finalize grant documentation
|
Main Street
|
Installation of automatic bollards for recurring closure of Main St for Farmer's Market |
$540,401 |
City CIP |
Construction contract to Council on 5/22 |
Begin construction July 2023
|
Traffic Signal Battery Backup System |
Install battery backup systems at 15 locations each year, beginning with critical and complex intersection that serve a large volume of traffic. |
$150,000 |
Measure M |
Installation of first 15 units June 2023 |
Plan for purchase and installation of 15 units in FY 2023-24 |
Traffic Signal Synchronization |
Conduct traffic signal timing update at all of the City's signalized intersections. Install additional limit line detection as necessary using video units at key intersections for traffic detection (vehicle, bicycle and pedestrian). |
$200,000 |
LA County Prop C |
Secure consultant contract |
|
Traffic Signal Fiber Optic Upgrades |
Approximately 75% of the City's traffic signals are connected with copper twisted pair wiring. Fiber optic cables will allow for all devices to function properly and without interruption. |
$300,000 |
Measure M |
Secure consultant contract |
|